M50 J4 Traveller's Rest Roundabout

Layout and signage

Ledbury
A449
Upton Bishop
B4221
A449 becomes M50
  B4221

A449




      Ledbury
A449
Upton Bishop
B4221
M50 becomes A449

Lane configuration

LanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.

LanesLanesLanesLanes

  • Lane 1 continues ahead.
  • Lane 2 continues, with option to exit.

Other events

  • Signs Start of motorway regulations
  • Signs End of motorway regulations

In this section

What's new

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated