M3 J4A Minley Interchange

Layout and signage

Farnborough (W)
A327
Fleet
(A3013)
  A327     A327
(A3013)
  Farnborough (W)
A327
Fleet
(A3013)

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

Other events

  • Signs Variable Speed Limits apply
  • Signs National Speed Limit begins

In this section

What's new

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

Share this page

Have you seen...

Ringways

The story of an incredible plan to reshape London into a city of motorways, with the history from creation to cancellation and details on every unbuilt road.

About this page

Published

Last updated