M26 (M20 J3) Addington Interchange

Layout and signage

N/A   M20



    M20



  Maidstone
Channel Tunnel
Dover
M20 Link

Lane configuration

LanesLanesLanesLanes

  • Lane 1 continues ahead.
  • Lane 2 continues ahead.

LanesLanesLanesLanesLanesLanesLanes

  • Lane 1 terminates.
  • Lane 2 terminates.
  • Lane 3 is gained from the entry sliproad.
  • Lane 4 is gained from the entry sliproad.
  • Lane 5 is gained from the entry sliproad.

In this section

What's new

The road that made no sense

It was the UK's only single-carriageway motorway, and twenty years ago it ceased to exist. This is the story of the strange fascination it held, and of my place in history.

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Share this page

Have you seen...

Road signs

A field guide to the UK's road signs, explaining the colours, shapes, symbols and everything else you need to know to avoid putting a foot (or a wheel) wrong.

About this page

Published

Last updated