M53 J4 Clatterbridge Interchange

Layout and signage

Clatterbridge
Heswall
A5137
Bebington
Port Sunlight
B5137
  A5137

B5151
    B5151

B5137
  Clatterbridge
Heswall
A5137
Bebington
Port Sunlight
B5137

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

In this section

What's new

The road that made no sense

It was the UK's only single-carriageway motorway, and twenty years ago it ceased to exist. This is the story of the strange fascination it held, and of my place in history.

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Share this page

Have you seen...

M1-A1 Link Road

Those last few miles of the M1 east of Leeds were completed in 1999. It looks for the most part like a fairly average piece of road, but one of the project's engineers describes some of the challenges that were faced.

About this page

Published

Last updated