M77 J3 Nitshill Interchange

Layout and signage

Nitshill
Paisley
Greenock
A727
  A726     A727   Nitshill
Thornliebank
Barrhead
A727

Lane configuration

LanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

Other events

  • Signs 50mph speed limit begins
  • Signs 60mph speed limit begins

In this section

What's new

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

Share this page

Have you seen...

A470 End to End

The road that connects Wales together, but which nobody really uses... All five hours of the A470, from Llandudno to Cardiff, are here.

About this page

Published

Last updated