M621 J3 Holbeck Interchange

Layout and signage

City Centre
A653
 


A653
    A653



  City Centre
A653

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 is gained from the entry sliproad.

LanesLanesLanesLanesLanes
LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Then further along:
  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

In this section

What's new

The Ringways Map is here

The wait is over! The full map of the Ringways, London’s unbuilt urban motorway network, is now online. Not even the system's planners had anything like this.

Red, white and blue

Kent County Council is run by eurosceptic nationalists. So why are they putting EU flags on their road signs?

The sunlit uplands

On Saturday 31 May something historic happened. The Heads of the Valleys Road was finally complete.

Share this page

Have you seen...

M6 Hanchurch-Lymm

One of the longest lengths of motorway to open in one go, this book celebrates the opening of the M6 from the Potteries to the North West.

About this page

Published

Last updated