M60 J8 Carrington Interchange

Layout and signage

Carrington
A6144
      A6144


  Carrington
A6144

Lane configuration

LanesLanesLanesLanesLanes
LanesLanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Then further along:
  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanesLanesLanesLanesLanes
LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • There is a barrier between lanes.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.
  • Lane 5 continues ahead.
  • Then further along:
  • Lane 1 terminates.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

Other events

  • Signs National Speed Limit begins
  • Signs Variable Speed Limits apply

In this section

What's new

The long way round

When a road is closed, why isn't the diversion route just the quickest way past the closure?

Signs and sensibility

The one great attempt to make London’s streets logical - and how one retired chauffeur’s favourite routes changed the way you get around the capital.

A bridge under troubled bridges

A bridge that was ruined by another bridge, and a type of highway planning beyond any of the UK’s worst nightmares.

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated