M56 J9 Lymm Interchange

Layout and signage

Preston
Leeds (M62 Link)
Birmingham
Manchester (N)
Lymm
M6 Link
  B5158

M6

A50
    A50



M6




  Preston
Liverpool (M62 Link)
M6 Link
Warrington
Lymm
A50

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 continues, with option to exit.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

In this section

What's new

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

Share this page

Have you seen...

Almondsbury Interchange

The UK's first four-level interchange opened in 1966. Relive some of the wonder and excitement of this icon of the motorway era with the book published to mark its completion.

About this page

Published

Last updated