M53 J1 Bidston Island

Layout and signage

Wallasey
Birkenhead
A554
All Docks Vehicle Ferry
A5139
Liverpool
(Tunnel)
 






A554
   



A5139



A554
  N/A

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

Other events

  • Signs End of motorway regulations
  • Signs 40mph speed limit begins
  • Signs Start of motorway regulations
  • Signs National Speed Limit begins

In this section

What's new

The road that made no sense

It was the UK's only single-carriageway motorway, and twenty years ago it ceased to exist. This is the story of the strange fascination it held, and of my place in history.

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Share this page

Have you seen...

Operation Stack

If there's trouble crossing the Channel, you'll see the lorries queuing on the M20. What is Operation Stack? Why does it cause so much trouble? And why, more than twenty years after it started, are we still using it?

About this page

Published

Last updated