M27 J4 Chilworth Interchange (West)

Layout and signage

      M3   Winchester
Eastleigh
London
M3 Link

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 is gained from the entry sliproad.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 exits and does not return.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

In this section

What's new

Where did the M25 come from?

London’s notorious orbital motorway turns 40 years old today. Where did it come from - and why the number “25”?

The long way round

When a road is closed, why isn't the diversion route just the quickest way past the closure?

Signs and sensibility

The one great attempt to make London’s streets logical - and how one retired chauffeur’s favourite routes changed the way you get around the capital.

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated