A23 Hickstead Interchange

Layout and signage

Burgess Hill
Goddards Green
A2300
Twineham
Hickstead Village
Services Hickstead
      A2300   Burgess Hill
Hickstead
Twineham
A2300

Services Hickstead

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

In this section

What's new

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

Share this page

Have you seen...

New Medway Viaducts

Taken over the course of two years, from 2002 to 2003, these sixteen images chart the construction of two new bridges alongside the M2 Medway Viaduct.

About this page

Published

Last updated