M20 J7 Detling Interchange

Layout and signage

Maidstone
Sittingbourne
Sheerness
A249
  A249     A249   Maidstone
Sheerness
Canterbury
Ramsgate
A249

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

Other events

  • Signs Variable Speed Limits apply
  • Signs National Speed Limit begins

In this section

What's new

Signs and sensibility

The one great attempt to make London’s streets logical - and how one retired chauffeur’s favourite routes changed the way you get around the capital.

A bridge under troubled bridges

A bridge that was ruined by another bridge, and a type of highway planning beyond any of the UK’s worst nightmares.

The monster seen from below

What might it have been like to stand in one spot and witness the arrival, and the uncertainty, of plans for an urban motorway in West London?

Share this page

Have you seen...

From War to Worboys

The tale of how British traffic signing developed between the Second World War and the mid-1960s, bringing us from a system designed at the turn of the century to the signs we still use today.

About this page

Published

Last updated