M8 J28A St. James Interchange (east)

Layout and signage

        Irvine
A737

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

Other events

  • Signs 60mph speed limit begins
  • Signs 50mph speed limit begins

In this section

What's new

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

London, in a new light

It was specially designed never to be noticed. And now it's disappearing, nobody has noticed its absence. It's London's own bespoke street light.

Share this page

Have you seen...

EuroRoute

Today you can catch a train to France. You can even put your car on it, and be there in less than an hour. But in the 1980s, Euro Tunnel had competition - including plans to build a motorway across the English Channel.

About this page

Published

Last updated