Tramway Lane underbridge piling works, 16 October 1995

Tramway Lane underbridge piling works (see all photos of the same view)

Piling works for the foundations of the bridge can be seen here. The red pile driver has sunk a new shaft and moved away to the right to start the next.

Date
Direction of view
East
Structures visible

Structure 8 (Tramway Lane underbridge)

What's new

The forever bottleneck, part 2

The second part of the story, where we learn why exactly the M4 gets narrower on the final approach to Europe’s biggest city.

The forever bottleneck, part 1

The M4 into London was one of the UK's earliest and most ambitious motorway projects. It was bold, pioneering... and almost instantly regretted.

Hello, here's my ridiculous side project

An introduction to what I write, and why I write it, and where my strange new road sign simulator fits in to all this.

Share this page

Have you seen...