A64 Bilbrough Top Improvement

Scheme outline

Replacement of the existing crossroads on the A64 between Tadcaster and York with a grade-separated junction, including the installation of a new flyover. This section of road is running well under capacity, with substandard junctions and a poor alignment. It was built during the 1930's, but at each end is connected directly on to modern grade-separated dual carriageway. Bilbrough Top is one of the most dangerous junctions on the route.

This scheme was completed in and we're no longer accepting updates or changes to this page.

Timescale
2004-2005
Cost
Unknown
Status
Completed
Type
Junction improvement
for use by all traffic
Highway authority
Funding
Central Government

Progress

14 September 2004

Construction of the new flyover is well under way.

14 July 2005

The new junction is opened to traffic.

More information

Routes