Scheme outline
Construction of a dual two-lane expressway to replace the existing A96 between Fochabers and Huntly, likely to be mostly achieved by building a new road alongside the existing A96.
Design work and development of possible route options, which will then be put out to consultation, is expected to begin during 2019. At the time of writing there is no proposed route for this section of road.
This scheme is part of the A96 Dualling Inverness to Aberdeen programme of works.